| RATE of Construction |
₹ 2,300.00 |
₹ 2,255.00 |
₹ 2,420.00 |
₹ 2,666.00 |
₹ 2,790.00 |
| ARCHITECTURAL Drawing |
Floor Plans |
Floor Plans 3D Elevation |
Floor Plans 3D Elevation |
Floor Plans 3D Elevation, 3D Interior Renders |
Floor Plans 3D Elevation, 3D Interior Renders |
| STRUCTURAL Drawing |
Nil |
Column Footing Plinth Beam Lintel Roof Beam Roof Slab Joinery Detail Staircase Drawings |
Column Footing Plinth Beam Lintel Roof Beam Roof Slab Joinery Detail Staircase Drawings |
Column Footing Plinth Beam Lintel Roof Beam Roof Slab Joinery Detail Staircase Drawings |
Column Footing Plinth Beam Lintel Roof Beam Roof Slab Joinery Detail Staircase Drawings |
| WORKING Drawing |
Nil |
Survey Dwg Centre Line Dwg Column Orientation Marking Dwg Stair Centering Parapet Elevation Detail Dwg |
Survey Dwg Centre Line Dwg Column Orientation Marking Dwg Stair Centering Parapet Elevation Detail Dwg |
Survey Dwg Centre Line Dwg Column Orientation Marking Dwg Stair Centering Parapet Elevation Detail Dwg Boundary Wall with Gate |
Survey Dwg Centre Line Dwg Column Orientation Marking Dwg Stair Centering Parapet Elevation Detail Dwg Boundary Wall with Gate |
| MEP Drawing |
Nil |
Lighting and Fan Provision Dwg |
Lighting and Fan Provision Dwg |
Lighting and Fan Provision Electrical Layout Plumbing Water Line Layout, Plumbing Drainage Line Layout, Detailed HVAC Design |
Lighting and Fan Provision Electrical Layout Plumbing Water Line Layout, Plumbing Drainage Line Layout, Detailed HVAC Design |
| Daily Update |
Nil |
Daily work and curing updates in WhatsApp group |
Daily work and curing updates in WhatsApp group |
Daily work and curing updates in WhatsApp group |
Daily work and curing updates in WhatsApp group |
| BRICK WORK Super Structure |
Red Bricks |
Red Bricks |
Box Red Bricks |
Wire Cut Red Bricks |
Wire Cut Red Bricks |
| BRICK WORK Basement |
Red Bricks |
Fly ash Bricks |
Fly ash Bricks |
Fly ash Bricks |
Fly ash Bricks |
| Building Set Out Marking |
Manually with Ropes and Pegs |
Manual Survey |
Digital Survey with Total Station |
Digital Survey with Total Station |
Digital Survey with Total Station |
| Footing Concrete |
M 15 |
M 20 |
M 20 |
M 20 |
M 25 |
| Plinth Beam Concrete |
M 15 |
M 20 |
M 20 |
M 20 |
M 25 |
| Roof Concrete |
M 15 |
M 20 |
M 20 |
M 25 |
M 25 |
| Other concrete at Site (Column, Lintel, etc.,) |
(1:2:4) |
(1:2:3) |
(1:2:3) |
(1:2:3) |
(1:1.5:3) |
| Roof height |
9'6" to 10' Including Slab Thickness |
10'6" Including Slab Thickness |
10'9" Including Slab Thickness |
10'9" Including Slab Thickness |
11'6" Including Slab Thickness |
| Roof Slab Thickness |
4.5" Thick |
4.5" Thick |
5" Thick |
6" Thick |
6" Thick |
| Cement |
CLASS B (Maha, Ultra, Penna, etc) |
CLASS A (Chetinad, JSW, Ramco Ultratech, Dalmia etc) |
CLASS A (Chetinad, JSW, Ramco Ultratech, Dalmia etc) |
CLASS A (Chetinad, JSW, Ramco Ultratech, Dalmia etc) |
CLASS A (Coromandel, Ultratech) |
| TMT Steel |
Surya, Arun |
GBR or Equivalent |
ARS |
iSteel |
JSW, TATA Tiscon |
| External Wall Thickness |
9" |
9" |
9" |
9" |
9" |
| Internal Wall Thickness |
4.5" |
4.5" |
4.5" |
4.5" |
4.5" |
| FOOTING PROTECTION in water logging Sites |
Nil |
Additional Clear Cover (80mm) with Concrete |
Additional Clear Cover (80mm) with Concrete |
Additional Clear Cover (80mm) with Concrete |
Additional Clear Cover (80mm) with Concrete |
| Plinth Beam Protection |
Bricks Below Plinth Beam Absorbs Water |
Plain Cement Concrete |
Plain Cement Concrete |
Plain Cement Concrete |
Plain Cement Concrete |
| Footing COLUMN PROTECTION in water logging sites |
Nil |
Nil |
Asphalt Bitumen Coating |
Asphalt Bitumen Coating |
Asphalt Bitumen Coating |
| Anti termite Treatment |
Nil |
Nil |
Treated at Basement |
Treated at Basement |
Treated at Basement |
| SILL BEAM below Windows at 3' |
Nil |
2" thick Sill Concrete below windows Building on all walls |
2" thick Sill Concrete below windows Building on all walls |
2" thick Sill Concrete below windows Building on all walls |
2" thick Sill Concrete below windows Building on all walls |
| LINTEL BEAM at 7' |
Cut Lintel Only above windows & Doors |
Cut Lintel Only above windows & Doors |
Cut Lintel Only above windows & Doors |
Full Lintel Above all walls |
Full Lintel Above all walls |
| Flooring Tile |
2'x2' tiles Rs.35/sqft |
4'x2' Glazed Vitrified tiles Rs.60/sqft |
1600mm x 800mm Glazed Vitrified Tiles Rs.100/sqft with 2mm spacer |
1600mm x 800mm Glazed Vitrified Tiles Rs.100/sqft with 2mm spacer |
6'x4' Glazed Vitrified Tiles Rs.150/sqft with 2mm spacer |
| Toilet & Kitchen Tile |
Digital tiles up to Lintel Level |
Rs.40 to 50 up to Lintel Level |
4'x2' Glazed Vitrified Tiles Rs.65/sqft with 2mm spacer |
4'x2' Glazed Vitrified Tiles Rs.65/sqft with 2mm spacer |
4'x2' Glazed Vitrified Tiles Rs.65/sqft with 2mm spacer |
| Main Door Entrance Step |
Step Tile @ Rs.50/Sft |
Granite @ Rs.120/Sft |
Granite @ Rs.150/Sft |
Granite @ Rs.150/Sft |
Granite @ Rs.180/Sft |
| Inner Staircase Step |
Step Tile @ Rs.50/Sft |
Tile @ Rs.60/Sft |
Granite @ Rs.100/Sft |
Granite @ Rs.120/Sft |
Granite @ Rs.120/Sft |
| Kitchen Counter Top |
Granite @ Rs.70/Sft |
Granite @ Rs.120/Sft |
Granite @ Rs.150/Sft |
Granite @ Rs.180/Sft |
Granite @ Rs.220/Sft |
| Main Door |
Teak Door & Frame with lock 3.5' x 7' |
Teak Door & Frame with Godrej lock 3.5' x 7' |
Teak Door & Frame with Europa lock 3.5' x 7' |
Teak Door & Frame with Europa lock 3.5' x 7' with Brass Fittings |
Modular Solid Teak door and frame with fingerprint Lock system 3.5' x 7'9" |
| Bed Door |
Solid wood Frame & Membrane Door |
Solid wood Frame & Membrane Door |
Teak Frame & Wooden Door with 1.5" thickness |
Teak Frame & Modern Wood Flush door with 1.5" Thickness |
Teak Frame & Customised Wood Flush door |
| Toilet Door 2'6" x 7' |
PVC @ Rs.3000 |
PVC @ Rs.3000 |
PVC @ Rs.5000 |
WPC/Fibre @ Rs.8000 |
Teak Colored UPVC @ Rs.15000 |
| Windows |
Plain UPVC Window |
UV Treated UPVC Windows |
UV Treated UPVC Windows |
UV Treated UPVC Windows |
UV Treated UPVC Wooden Coloured Windows with inbuilt insect mesh |
| Window Grill |
10mm Rod |
10mm Rod |
10mm Rod |
10mm Rod |
12mm Rod |
| External Plumbing waterline Pipe material |
PVC |
PVC |
UPVC Supreme or Equivalent |
UPVC Supreme or Equivalent |
UPVC Astral/ Finolex |
| Concealed Plumbing Pipe material |
CPVC |
CPVC Ashirvad or Eqv. |
CPVC Ashirvad or Eqv. |
CPVC Finolex or Eqv. |
CPVC Astral/ Finolex |
| Plumbing Method |
Single Line |
Double Line Corporation Water, Bore Water |
Double Line Corporation Water, Bore Water |
Triple Line Corporation Water, Bore Water Solar Water |
Triple Line Corporation Water, Bore Water Solar Water |
| Outer PLUMBING PIPE Bracket |
U clamp |
Apartment clamp |
Apartment clamp |
Apartment clamp |
Apartment clamp |
| BATH FITTINGS |
Uncertain |
Parryware |
Essco Jaquar |
Jaquar |
Kohler/ American Standard |
| Over Head Tank Tripple Layer White |
Additionally Charged |
Additionally Charged |
Additionally Charged |
Additionally Charged |
2000 Litre |
| Wire |
Any ISI wire say Kundan, SEI |
Orbit |
Orbit |
Havels/ RR Kabel |
Havels/ RR Kabel |
| ELECTRICAL POINTS on Room Wall |
Limited |
On 3 walls of room as per client's requirement |
On 3 walls of room as per client's requirement |
On all 4 walls of room as per client's requirement |
On all 4 walls of room as per client's requirement |
| ELECTRICAL POINTS on Specific Requirements |
Additional Charges |
AC, EV Charging, Dishwasher, Chimney, Solar in Terrace etc., |
AC, EV Charging, Dishwasher, Chimney, Solar in Terrace etc., |
AC, EV Charging, Dishwasher, Chimney, Solar in Terrace etc., |
AC, EV Charging, Dishwasher, Chimney, Solar in Terrace etc., |
| Switches |
Fybros/ Anchor |
GM/Anchor |
GM/ Legrand Basic |
GM/ Legrand Basic |
Modular with Automation |
| MCB Panel Box with 3 Phase Rotary with MCB |
Ordinary |
Legrand/Fybros with Rotary Switch |
Legrand/Fybros with Rotary Switch |
Legrand/Fybros with Rotary Switch |
Legrand/Fybros with Rotary Switch |
| UPS wiring |
Nil |
Provided at all Points |
Provided at all Points |
Provided at all Points |
Provided at all Points |
| CCTV Piping & Wiring Only |
Nil |
Nil |
Four Corners of Building |
Eight Corners of Building |
Eight Corners of Building |
| Sunken Slabs for Toilet |
Additionally Charged |
Additionally Charged |
No Extra Charges |
No Extra Charges |
No Extra Charges |
| Toilet Water Proofing |
Additionally Charged |
Piddilite Brand Dr.Fixit/ Equivalent |
Fosrac Brand Dr.Fixit/ Equivalent |
Fosrac Brand Dr.Fixit/ Equivalent |
Fosrac Brand Dr.Fixit/ Equivalent |
| Internal Wall Painting |
2 coat Putty + 2 coat paint |
2 coat Putty + 1 coat Primer with 2 Coats Paint |
2 coat Putty + 1 coat Primer with 2 Coats Paint |
2 coat Birla Putty + 1 coat waterproof Asian Primer with 2 coats of premium Paint |
2 coat Birla Putty + 1 coat waterproof Asian Primer with 2 coats of premium Paint |
| To Avoid Cracks |
Nil |
Pillars & Brick; Beams & Brick Joints; Electrical Groves provided with Glass Fibre Mesh |
Pillars & Brick; Beams & Brick Joints; Electrical Groves provided with Glass Fibre Mesh |
Pillars & Brick; Beams & Brick Joints; Electrical Groves provided with Glass Fibre Mesh |
Pillars & Brick; Beams & Brick Joints; Electrical Groves provided with Glass Fibre Mesh |
| External Painting |
2 coats distemper |
1 Coat of White Cement plus 2 coats exterior emulsion on all sides |
1 Coat of White Cement plus 2 coats exterior emulsion on all sides |
1 coat exterior waterproof primer and 2 coats exterior emulsion |
1 coat exterior waterproof primer and 2 coats exterior emulsion. Elevation finished with 2 coats putty and two coats exterior emulsion |
| Weathering Course |
Additionally Charged per SFT |
Additionally Charged per SFT |
Surkhi with Baby chips Cement Flooring Finish Cool Roof Paint |
Surkhi with Baby chips Cool Roof Tile |
Surkhi with Baby chips Cool Roof Tile |
| Basement Height |
2'0" from E.G.L |
3'6" from E.G.L |
3'6" from E.G.L |
3'6" from E.G.L |
1.2m from E.G.L |
| Basement Height of Parking Floor |
On Ground Level |
2'6" Below Ground Floor Level |
2'6" Below Ground Floor Level |
2'6" Below Ground Floor Level |
2'6" Below Ground Floor Level |
| M.S Stand for Drying Cloth in Terrace |
Additionally Charged |
1 set Provided |
1 set Provided |
1 set Provided |
2 set Provided |
| Washing Stone, Water Supply & Drainage |
Additionally Charged |
Additionally Charged |
Additionally Charged |
Additionally Charged |
Provided |